付加断熱下地(北側)Additional insulation base (north side)

2018/11/12 - 2018東川田園の家 Higashikawa Rural House

200mmの付加断熱下地が進んでいます、南、東、西面と進んで最後に北面を施工しています。

200 mm additional insulation base is progressing, we are going to the south, east, west side and finally construct the north side.